Environmental Management at Ok Tedi
The Ok Tedi copper and gold mining project is located in the headwaters of the Fly River system in western Papua New Guinea._x000D_
The project's Feasibility Study was completed in 1979, and in- cluded a preliminary environmental assessment and an environ- mental management program. Construction commenced in 1981, an environmental impact study was completed in 1982, mining and treatment of gold ore commenced in 1984, staged construction of copper ore processing facilities took place during 1986-1988, and a further major environmental study was carried out for the operat- ing mine during 1986-1989. A very considerable data base of environmental information has been assembled by means of a comprehensive monitoring program. Environmental management criteria applied to the Project have reflected the stages and nature of development and operation._x000D_
Criteria have been designed to regulate potential environmental impacts in the Fly River. An Acceptable Particulate Level of suspended sediment is the principal criterion. Compliance is con- ditional upon -a limited reduction in fish biomass, and upon dis- solved and particulate copper concentrations not exceeding predicted values at various locations throughout the river system._x000D_
The criteria were established by the Government of Papua New Guinea following evaluation of environmental studies undertaken by the mining company. Compliance is checked by a detailed monitoring program, frequent reporting and statistical evaluation of monitoring results.
The project's Feasibility Study was completed in 1979, and in- cluded a preliminary environmental assessment and an environ- mental management program. Construction commenced in 1981, an environmental impact study was completed in 1982, mining and treatment of gold ore commenced in 1984, staged construction of copper ore processing facilities took place during 1986-1988, and a further major environmental study was carried out for the operat- ing mine during 1986-1989. A very considerable data base of environmental information has been assembled by means of a comprehensive monitoring program. Environmental management criteria applied to the Project have reflected the stages and nature of development and operation._x000D_
Criteria have been designed to regulate potential environmental impacts in the Fly River. An Acceptable Particulate Level of suspended sediment is the principal criterion. Compliance is con- ditional upon -a limited reduction in fish biomass, and upon dis- solved and particulate copper concentrations not exceeding predicted values at various locations throughout the river system._x000D_
The criteria were established by the Government of Papua New Guinea following evaluation of environmental studies undertaken by the mining company. Compliance is checked by a detailed monitoring program, frequent reporting and statistical evaluation of monitoring results.
Contributor(s):
R J Higgins
-
Environmental Management at Ok TediPDFThis product is exclusive to Digital library subscription
-
Environmental Management at Ok TediPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1991
- PDF Size: 0.03 Mb.
- Unique ID: P199102016