Conference Proceedings
World Gold '97 Conference, Singapore, September 1997
Conference Proceedings
World Gold '97 Conference, Singapore, September 1997
The Toka Tindung Gold Project Northern Sulawesi, Indonesia
Astute exploration on the northern Minahasa Peninsula, North Sulawesi, resulted in the discovery of the Toka Tindung, Pajajaran, Blambagan and Araren low-sulphidation quartz-adularia vein and stockwork gold-silver deposits. Combined, these deposits have estimated mineral resources in excess of I Moz gold at an average grade of 2.8 gAu/t and 7 gAg/t and are known as the Toka Tindung Gold Project. Gold typically occurs as fine grained electrum and is often associated with acanthite. The structurally controlled mineralised veins are hosted by Late Pliocene plagioclase and pyroxene-phyric basaltic andesite volcaniclastics and flows which form part of the Early Miocene to Pleistocene Sulawesi-East Mindanao Arc. Silica-adularia alteration dominates the volcaniclastic host of the Toka Tindung deposit. K-Ar dating of vein adularia indicates a 2.16_x000D_
0.04 Ma mineralisation age. Relatively narrow envelopes of silicification and argillisation surround the chalcedonic silica, quartz and adularia veins, stockworks and breccias at the other three deposits._x000D_
Remnant hydrothermal breccias, chalcedony and anomalous arsenic, antimony and mercury indicate these gold deposits were part of a mineralised geothermal system._x000D_
As of June 1997, Aurora Gold Ltd is finalising a feasibility study on exploitation of the four deposits and treatment of ore through a centrally located conventional CIP plant. Subsea tailings disposal is anticipated._x000D_
Favourable metallurgy of the ore and logistics of the project area assist in minimising capital requirements.
0.04 Ma mineralisation age. Relatively narrow envelopes of silicification and argillisation surround the chalcedonic silica, quartz and adularia veins, stockworks and breccias at the other three deposits._x000D_
Remnant hydrothermal breccias, chalcedony and anomalous arsenic, antimony and mercury indicate these gold deposits were part of a mineralised geothermal system._x000D_
As of June 1997, Aurora Gold Ltd is finalising a feasibility study on exploitation of the four deposits and treatment of ore through a centrally located conventional CIP plant. Subsea tailings disposal is anticipated._x000D_
Favourable metallurgy of the ore and logistics of the project area assist in minimising capital requirements.
Contributor(s):
A J Moyle, B A Wake, S H Tuckey, J Ariti
-
The Toka Tindung Gold Project Northern Sulawesi, IndonesiaPDFThis product is exclusive to Digital library subscription
-
The Toka Tindung Gold Project Northern Sulawesi, IndonesiaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1997
- PDF Size: 0.99 Mb.
- Unique ID: P199702038