Conference Proceedings
World Zinc '93
Conference Proceedings
World Zinc '93
Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc Plant
Over the last two years work has been undertaken within the Pasminco Metals - BHAS Zinc Plant to improve the efficiency and maintain the production capacity of the operation. The work has centred upon the installation of suitable process instrumentation to improve process control and the development of new unit operations to maintain control of the circuit water and sulphate balance. A key aspect of the new process instrumentation has been the development of an on-line analyser to monitor the total antimony concentration during zinc dust purification. As a result of changes made to the Zinc Plant in order to contain all effluent within the circuit, a problem developed with control of both the water and sulphate balance of the circuit. A new neutralisation plant to treat all cell house waste water so that it can be contained within the circuit has been developed and installed. In addition changes have been made to the existing circuit to control deliberately the circuit sulphate concentration by precipitation of sodium and potassium jarosite.
Contributor(s):
M A Bannear, D P Nolan, M Balales
-
Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc PlantPDFThis product is exclusive to Digital library subscription
-
Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.347 Mb.
- Unique ID: P199307046