Recent Operation at Harima Works
The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and the capacity had increased 6600 t/month of zinc and 2200 t/month of lead without enlarging the furnace size. During the ten weeks campaign shut-down at the end of 1990, many modifications were carried out including the enlargement of the furnace shaft area. By these changes, the capacity has gone up to 7500 t/month of zinc and 2500 t/month of lead. In the sinter plant, the amount of SO2 rich gas supplied to the acid plant was raised to 50 000 Nm3/h from 43 500 Nm3/h. An electrostatic precipitator was adopted instead of a venturi scrubber to clean the rich gas. Oxygen enrichment has been continuously operated since August 1991, because the furnace capacity is more than the rate of sinter production. Utilisation of the sinter plant is high being as much as 97 per cent and the sulphur burning rate has been increased. In 1990 the furnace was replaced except the hearth. The shaft area was enlarged to 19.4 m2 from 15.3 m2. The target blast was designed to be more than 36 000 Nm3/h. Tuyere layout was changed to prevent slag breakouts. Due to these modifications shaft condition has been very good. Automatic launder jacket cleaners were installed to increase the lead cooling efficiency. Many other improvements and developments were also made. Coke powder injection from the tuyeres has been successfully operated since April 1987.
Contributor(s):
S Tsuyuguchi, H Kadoya, Y Kondo
-
Recent Operation at Harima WorksPDFThis product is exclusive to Digital library subscription
-
Recent Operation at Harima WorksPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1993
- PDF Size: 0.558 Mb.
- Unique ID: P199307048