Skip to main content
Conference Proceedings

XVIII International Mineral Processing Congress - Five Volume Set

Conference Proceedings

XVIII International Mineral Processing Congress - Five Volume Set

Publication sale now on, get up to 70% off

PDF Add to cart

Grinding Control at the Fan Kou Mine

A joint project between the Fan Kou Mine, the Guangzhou Research Institute of Non-ferrous Metals, the Julius Kruttschnitt Mineral Research Centre, and the Changsha Design and Research Institute of Non-ferrous Metals has implemented grinding control on a circuit consisting of two primary mills and a single secondary mill at the Fan Kou mine in northern Guangdong province, PR China. This paper describes the initial design of the control system and the changes made during its implementation. The initial design was to obtain maximum throughput at a constant product size. This was changed so that the control provided a constant product density at a set feed rate. The set feed rate is reduced when necessary to prevent overloading of critical components in the circuit. The reasons for the changes in the control strategy are discussed.
Return to parent product
  • Grinding Control at the Fan Kou Mine
    PDF
    This product is exclusive to Digital library subscription
  • Grinding Control at the Fan Kou Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1993
  • PDF Size: 0.129 Mb.
  • Unique ID: P199303087

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.