Conference Proceedings
XXV International Mineral Processing Congress (IMPC) 2010
Conference Proceedings
XXV International Mineral Processing Congress (IMPC) 2010
Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHS
Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHS Generally speaking, a high-grade fluorite ore is converted into hydrogen fluoride (HF), which is essential for the semiconductor manufacturing._x000D_
With the continuous depletion of resources, novel technologies for processing low-grade fluorite ores are urgently needed, in order to lower the arsenic concentration to less than 100 mg/kg._x000D_
In this study, a low-grade fluorite ore was upgraded by removing arsenic, which is difficult to remove by conventional method. The mechano-chemical leaching of fluorite ore (i.e. the sample was ground in presence of NaHS, using a beads mill) was carried out to investigate the removal of arsenic from the low-grade fluorite. Experimental results showed that the arsenic concentration was reduced to 73.2 mg/kg.
With the continuous depletion of resources, novel technologies for processing low-grade fluorite ores are urgently needed, in order to lower the arsenic concentration to less than 100 mg/kg._x000D_
In this study, a low-grade fluorite ore was upgraded by removing arsenic, which is difficult to remove by conventional method. The mechano-chemical leaching of fluorite ore (i.e. the sample was ground in presence of NaHS, using a beads mill) was carried out to investigate the removal of arsenic from the low-grade fluorite. Experimental results showed that the arsenic concentration was reduced to 73.2 mg/kg.
Contributor(s):
G Dodbiba, H Park, K Higashino, S Matsuo, K Okaya, J Sadaki, T Fujita
-
Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHSPDFThis product is exclusive to Digital library subscription
-
Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHSPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.496 Mb.
- Unique ID: P201007076