Conference Proceedings
XXV International Mineral Processing Congress (IMPC) 2010
Conference Proceedings
XXV International Mineral Processing Congress (IMPC) 2010
SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent Ores
SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent Ores Smarter processing for the future, in the area of SAG mill design involves accurate grinding test data, completing final mill design in less than three months, and at a cost of less than US$80 000. More detailed variability testing on the other hand takes longer, is more expensive, and is used for throughput optimisation for an existing or newly purchased mill. This paper shows that SAGDesignTM testing is excellent for new SAG plant design due to relatively low cost per test and the ability to do more testing for a limited budget on larger projects. It also briefly examines a way to develop proper geometallurgical ore hardness information on every block in the mine model, from the more detailed analysis data.
Contributor(s):
J Starkey, P Scinto
-
SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent OresPDFThis product is exclusive to Digital library subscription
-
SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent OresPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.531 Mb.
- Unique ID: P201007138