Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference

Mill Operators 2018

Conference

Mill Operators 2018

Cleaner circuit optimisation at Cadia Operations

Keeping up with the Joneses – the value of industry surveys and benchmarking Watch
Addressing challenging applications of intensive cyanidation in gravity gold recovery Watch
SAG mill Optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success story Watch
Optimising the operation of paste thickening at the Yara Siilinjärvi Plant Watch
Modular SAG mill discharge trommel for maintenance flexibility and performance Watch
Session 3B Discussion - Automation and Control Watch
Carbon kiln selection, operation and maintenance Watch
The upgrading of low grade nickel ore stockpiles at Western Areas Ltd’s Forrestania Operations using a mobile ore sorting plant Watch
Session 1D Discussion - Unit Process in Communication Watch
Session 2A Discussion - Preconcentration Watch
Panel discussion education Watch
Optimisation of Asanko’s Obotan SABC circuit to achieve Project 5 Million Watch
Mineral liberation studies of IMPTEC super-fine crusher - 130 crushed product Watch
Advanced mine to mill application at the Barrick Cortez mine Watch
Session 2d discussion - downstream processing Watch
Flotation control using froth stability - past, present and future - Watch
Improving fine sulphide mineral recovery in the Independence Jaguar zinc flotation circuit Watch
Flotation circuit efficiency improvement at Northern Star Resources Limited's Kanowna Belle gold mine Watch
Mill Operators’ conferences – a 40-year retrospective and a vision for the future Watch
A reliable solution for pumping mineral froth with challenging froth volume Watch
Session 1 Discussion - Plenary Watch
Process improvement opportunities in comminution circuits Watch
Metallurgical test work – between a rock and a hard place Watch
Investing in new process improvement technology: reducing the risk of implementation – a way forward Watch
Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control Watch
The development of optimised pulp lifter design for the Ahafo SAG mill using DEM modelling Watch
Tailing filtration practices in Mexican gold and silver mines Watch
Developing flotation circuit control and automation for the Phu Kham Copper-Gold Concentrator Watch
Getting the most from existing processes – using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited Watch
Flotation launder design and the measurement of critical froth transport parameters Watch
Characterising energy efficiency of particle sorting Watch
Effects of pulp chemistry on plant and laboratory flotation modelling Watch
The designed approach to mill liner optimisation – experience at Pustynnoye mine, Kazakhstan Watch
Session 1b discussion - operation updates Watch
How to find the optimum air rate for flotation cells Watch
Session 2c discussion - comminution Watch
Session 1c discussion - flotation Watch
Pyrite depression at Boliden Tara using F-250 – a biopolymer Watch
Mount Carlton comminution circuit design, start-up and optimisation Watch
An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp Mine Watch
High voltage pulse preconcentration study using a low grade copper-gold ore Watch
Session 3c discussion - comminution Watch
Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator Watch
Session 2b discussion - floatation Watch
Shifting the comminution workload from the primary ball mill to towermill circuit Watch
What category cyclone is devastating your plant? Watch
The application of secondary crushing at the Jundee gold mine Watch
The evolution of the Cadia 40’ SAG mill to treat the Cadia East orebody – a case study of incremental change leading to operational stability Watch
Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control Watch
Session 3a discussion - emerging technologies Watch
High shear rotor trials in the Mount Isa Mines Copper Concentrator Watch
Cleaner circuit optimisation at Cadia Operations Watch
Automated, online measurement of bulk material size distribution on conveyor using 3D profile imaging at Boliden Mines Watch
Return to parent product
  • Mill Operators 2018
Already own this product?
Click here to sign in
PD Hours
Approved activity
  • Published: 29/8/2018
  • Duration: 15 minutes
  • Unique ID: VID10229

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.