Slope Stability Investigations at the Mt. Whaleback Iron Ore Mine, Western Australia
Mt. Newman Mining Company Pty. Ltd.3 oper ates the Mt. Whaleback iron ore mine in the Ham- ersley Iron Ore Province of Western Australia._x000D_
The present rate of production of high grade hematite iron ore is 33 million tonnes per year. Mining is by open cut quarrying,with 15m high benches. The present quarry operations will be extended to a large oval pit to win over 1400 million tonnes of iron ore. The pit slopes will extend up to 500m in depth and the perimet- er of the slopes will exceed 15km. Sixty per- cent of the ore is below the water table, which presently lies 45m below the general plain level Dames & Moore, rock mechanics consultants designed the pit slopes during early mine devel- opment to ensure an economic and safe operation.
The present rate of production of high grade hematite iron ore is 33 million tonnes per year. Mining is by open cut quarrying,with 15m high benches. The present quarry operations will be extended to a large oval pit to win over 1400 million tonnes of iron ore. The pit slopes will extend up to 500m in depth and the perimet- er of the slopes will exceed 15km. Sixty per- cent of the ore is below the water table, which presently lies 45m below the general plain level Dames & Moore, rock mechanics consultants designed the pit slopes during early mine devel- opment to ensure an economic and safe operation.
Contributor(s):
S M Kale, J P Trudinger
-
Slope Stability Investigations at the Mt. Whaleback Iron Ore Mine, Western AustraliaPDFThis product is exclusive to Digital library subscription
-
Slope Stability Investigations at the Mt. Whaleback Iron Ore Mine, Western AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1975
- PDF Size: 1.077 Mb.
- Unique ID: P197504034