Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore

The process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The existing crushing plant, water supply, reagents, laboratory and infrastructure facilities from the heap leach have been upgraded and expanded to meet the C.I.P._x000D_
plant requirements. The new power supply is from the North Queensland grid system. A series of metallurgical tests was carried out and a review of the data showed that the primary ore was amenable to conventional cyanide leaching. Following feasibility studies, a new process plant which included grinding mills, leaching, and adsorption tanks, thickener, desorption and gold roam facilities was constructed.
Return to parent product
  • Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore
    PDF
    This product is exclusive to Digital library subscription
  • Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1989
  • PDF Size: 0.665 Mb.
  • Unique ID: P198903007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.