Conference Proceedings
Rock Breaking Equipment and Techniques, Melbourne
Conference Proceedings
Rock Breaking Equipment and Techniques, Melbourne
Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited
Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are used at both sites in that material is drilled and blasted in benches, loaded by shovels and hauled to the Primary Crushers or dumped on waste or low grade material stockpiles. The present drilling fleet, consisting of eight high capacity Bucyrus Erie Rotary drills has evolved from an initial fleet of a large number of small percussion rigs. There are significant physical differences between the ore types encountered at both mines which nec- essitate the drilling of smaller diameter blast holes at Paraburdoo than those at Tom Price. The drilling practice at each site is dis- cussed, with examples of performance achieve- ments under varying drilling conditions.
Contributor(s):
T A Ward, A J Bradley
-
Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. LimitedPDFThis product is exclusive to Digital library subscription
-
Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1978
- PDF Size: 0.262 Mb.
- Unique ID: P197802009