Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,
During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in the Parkes process by a selective zincing, and -in the continuous process by treatment with zinc in a special de-golding kettle, in each case a crust being obtained carrying the gold and a small portion of the silver. Actually the process could have been more correctly termed a de-copperising process, on accountof the relatively large amount of this metal present, and its affinity for zinc, which caused it to enter the crusts produced.The crust was treated in reverberatory furnaces, where the bulk of the copper and zinc was removed in by-products, and the resulting "gold bullion" cupelled to give adore bullion containing approximately 2,000 ounces gold per ton.For the purpose of parting this dore, a small Balbach-Thum plant of 11 cells was used, and once each six months a short campaign was conducted on the accumulated metal.With the development of the process of de-copperising smelter bullion by means of sulphur, when a bullion averaging about .004% copper was constantly available for refining, the need for a separate de-golding process disappeared.The de-golding kettle of the Continuous Process...
Contributor(s):
F A Green, B E Met
-
Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,PDFThis product is exclusive to Digital library subscription
-
Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,PDFNormal price $22.00Member price from $0.00