Conference Proceedings
The AusIMM Proceedings 1956
Conference Proceedings
The AusIMM Proceedings 1956
Milling at Great Western Consolidated No Liability, Bullfinch, W.A.
The gold treatment plant of Great Western Consolidated N.L. is at Bullfinch, Western Australia, 22 miles north of Southern Cross, which is 100 miles west of Kalgoorlie. A railway to Southern Cross connects the mine with the main Perth-Kalgoorlie line.The plant, which commenced operations on the 31st October, 1952, was, designed by Messrs. Alex: Stewart & Co. in consultation with the technical staff of Western Mining Corporation Ltd. to treat 1,000 long tons a day, made up of approximately equal parts of quarry oxidized ore and underground sulphide ore, by moderately coarse grinding (2-3 per cent plus 65 mesh Tyler) and straight cyanidation without straking. The design had to allow for future treatment of all sulphide ore at the rate of 40,000 tons per 28-day periodand to make provision for the possible later inclusion of preaeration treatment.The test work on .which design was based was done on representative development samples, the mine being divided into zones for this purpose, to check possible local variations from average treatment behaviour. Proposed mill feed mixtures were made up from time to time for complete ore dressing tests, which were conducted in the Western Mining Corporation laboratory at Kalgoorlie.The chief feature of the design was that the plant had to handle the extremes of very soft, poor settling and filtering oxidized ore and very hard, good settling and filtering sulphide ore. On one hand, crushers and mills had to be large enough to handle the sulphide ore and on the other, thickeners and filters had to be large enough to handle the oxidized ores.The design is marked by simplicity, the use of large units of equipment, and flexibility to cope with a variety of ores.
Contributor(s):
E K Penrose, G L Howard
-
Milling at Great Western Consolidated No Liability, Bullfinch, W.A.PDFThis product is exclusive to Digital library subscription
-
Milling at Great Western Consolidated No Liability, Bullfinch, W.A.PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1955
- PDF Size: 0.382 Mb.
- Unique ID: P_PROC1956_0799