Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The AusIMM Proceedings 1957

Conference Proceedings

The AusIMM Proceedings 1957

PDF Add to cart

No 3. Services and Surface Area

In the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards 'located in the winder house.(b) Miscellaneous electrical indicating, control and signalling systems.(c) Telephone lines from the main internal automatic exchange located in the changehouse, the town exchange to the automatic exchange and also direct lines from the town exchange to selected offices.(d) Compressed air from the incoming 16-in. air main. (e) Water, both unfiltered and filtered; and the disposal of the following effluents:(f) Sewage from the area to the town sewage system.(g) Changehouse shower water to the regeneration area.(h) Storm water to the general mine surface drainage system leading out to the naturally drained area north of the No. 8 Shaft.
Return to parent product
  • No 3. Services and Surface Area
    PDF
    This product is exclusive to Digital library subscription
  • No 3. Services and Surface Area
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1956
  • PDF Size: 1.192 Mb.
  • Unique ID: P_PROC1957_0823

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.