To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepared to cover the needs of general shaft servicing work for men and materials, mullock and ore handling, and the probable requirements of a breaker station to be built adjacent to the headframe, which would provide for the crushing of the run-of-mine ore down to a size which would be suitable for feeding on to the concentrating mill.