Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The AusIMM Proceedings 1957

Conference Proceedings

The AusIMM Proceedings 1957

PDF Add to cart

Notes on the New Broken Hill Consolidated Ltd. Service Shaft

This paper briefly describes the shaft, including sinking, steel sets and their installation, shaft equipment and winders.INTRODUCTIONThe New Broken Hill Consolidated Ltd. Service Shaft is a vertical concrete-lined circular shaft, 20 ft. in diameter with -steel sets spaced at 12-ft. centres. The diameter of 20 ft. was established as the minimum that would enable the shaft both to house the proposed hoisting and service equipment and to satisfy ventilation requirements as a downcast airway. The 12-ft. set spacing was based on South African practice in similar types of shafts.The shaft extends from the surface to 28 ft. below No. 22 Level, a total depth of 3,194 ft. Sinking was commenced in September 1946, and equipping completed in January 1955. Initially the shaft was sunk and concrete-lined to a depth of 52 ft., using a stiff-legged crane and clam-shell grab for mucking. Operations were suspended at this depth to allow the installation of the steel sinking head-frame, winders and ancillary equipment.Sinking and concreting were recommenced after four months and continued to a depth of 1,035 ft. 6 in., where the shaft connected with a pilot opening. The concrete lining was poured as sinking progressed and was piped from the surface to this depth, after which all concrete was lowered in buckets and discharged through a distributor suspended in the shaft. A cycle of stripping to the pilot opening and concreting was continued until the shaft reached No. 22 Level. From this level the remaining 28 ft. was sunk full size. All plats were cut and concreted as sinking progressed.
Return to parent product
  • Notes on the New Broken Hill Consolidated Ltd. Service Shaft
    PDF
    This product is exclusive to Digital library subscription
  • Notes on the New Broken Hill Consolidated Ltd. Service Shaft
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1956
  • PDF Size: 1.196 Mb.
  • Unique ID: P_PROC1957_0839

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.