Conference Proceedings
The AusIMM Proceedings 1958
Conference Proceedings
The AusIMM Proceedings 1958
Design and Construction of No. 2 Residue Dam at Rosebery
Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall which can eventually be carried to a greater height.EXPERIENCE WITH No. 1 DAMResidue from the lead zinc concentrating mill, which treats the ore from the Rosebery and Hercules Mines, was pumped 3,600 ft. through a 5-in. diameter woodstave pipeline to the site of the dam. It was formerly delivered through a 4-in. steel pipeline.State laws prevent the residue being discharged to waste into the Stitt River. Furthermore, as a pyritic residue it is a potential source of sulphur.Between 1936 and 1956 more than 1,000,000 tons. of residue was paddocked. The run-of-mill product was roughly classified at the dam in a 6-ft. diameter cone classifier and the sand fraction was pumped by a 3-in. pump to the front wall of the dam across a shallow valley. The overflow gravitated to the rear of the dam (Fig. 1). Typical sizings were:
Contributor(s):
Electrolytic Zinc Company of Australia, West Coast Staff
-
Design and Construction of No. 2 Residue Dam at RoseberyPDFThis product is exclusive to Digital library subscription
-
Design and Construction of No. 2 Residue Dam at RoseberyPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1957
- PDF Size: 0.145 Mb.
- Unique ID: P_PROC1958_0861