Skip to main content
Conference Proceedings

The AusIMM Proceedings 1961

Conference Proceedings

The AusIMM Proceedings 1961

PDF Add to cart

Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commissioning the new 4500 h.p. winder at No. 2 Ore Shaft in January, 1958, it was realised that the increase in hoisting speed from 1800 to 2650 ft/min. would cause high shaft guide reactions which would be increased further when the elongated 12 ton skips replaced the existing 7 ton skips.The Cambridge accelerometer was used to measure the shaft guide reactions and to confirm that progressive skip modifications were resulting in reduced reactions. The skip modifications were completed in 4 weeks.INTRODUCTIONIn 1956 an expansion programme was initiated to increase production from 5000 to 11000 tons per mining day. At No. 2 Ore Shaft the 1500 h.p. winder operated at 1800 ft./min. and hoisted a 7 ton capacity skip. The new 4500 h.p. winder operates at 2650 ft./min. and hoists a 12 ton capacity skip. No. 2 Ore shaft is equipped with two 5 ft. by 5 ft. hoisting compartments (Fig. 1) and any increase in skip capacity meant an abnormally long skip. This feature, coupled with the increase in hoisting speed, could have caused very high shaft guide reactions. Before commissioning the 4500 h.p. winder, a Cambridge accelerometer was borrowed from the University of Adelaide and was used to measure the shaft guide reactions. Rather than carry out an extensive shaft timbering programme, the skips were modified by fitting cushioned guide shoes and spring loaded guide rollers (Fig. 1). Testing commenced in February, 1958, and was completed in March, 1958.
Return to parent product
  • Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1960
  • PDF Size: 0.425 Mb.
  • Unique ID: P_PROC1961_0945

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.