The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited
The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engineering Company in conjunction with staff of Mount Isa Mines Limited. Metallurgical design followed conventional wet milling practice, but the size of many plant units is larger than previously used at Mount Isa. The. total capacity of the new plant is 150,000 tons per four weekly period, and the plant is designed to operate in two equal parallel sections.Erection was contracted on a turnkey basis, and the plant was commissioned as a production unit on 23rd June 1966.The existing concentrator, No. I, was converted to treat all copper ore, and the total capacity of the two plants is now 390,000 tons per four weekly period.
Contributor(s):
R H Challen, N Draper, C W Hoffmann, R B Menzies
-
The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines LimitedPDFThis product is exclusive to Digital library subscription
-
The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1967
- PDF Size: 3.967 Mb.
- Unique ID: P_PROC1968_1168