Skip to main content
Conference Proceedings

The AusIMM Proceedings 1969

Conference Proceedings

The AusIMM Proceedings 1969

PDF Add to cart

The Preparation, Storage, and Placing of Hydraulic Fill, C.S.A. Mine, Cobar

To provide suitable backfill material for the cut and fill mining method being used to extract ore from the C.S.A. mine, flotation tailings are deslimed in single stage cyclones. The sand fraction is stored on the surface in unagitated storage bins before being pumped underground, while the slime portion is thickened and pumped to a residue dam. Design and operating details of the sand preparation and storage sections are given.The initial preparation of a stope for filling, consists of laying percolation and decantation drainage pipes on the sill floor. Preparation for fllling of subsequent lifts consists of rearing up the ventilation pipes at the ends of the stope, preparing the decantation system, and building a barricade or wall. The fill is carried to, and discharged into, the stope through 4 in. diameter pipes and filling of any section is carried out 24 hr/day normally without supervision. The fill is retieulated underground to the 1200 ft level through rubber lined pipe installed in the upcast shaft. Boreholes of 3 in. diameter drilled from the1200 ft level convey fill to the 1800 ft level. The mine drainage system is basically designed to handle the water associated with hydraulic filling. A system of primary and secondary sumps has been installed to handle the percolation and decantation drainage from stapes and to allow settling of fines before the water is fed to the main pump station.A programme of investigation into the properties of the emplaced fill is in progress. Results to date indicate that the fill as presently placed and drained, will not cause any problems in the mining of vertical orebodies by cut and fill methods for lifts in excess of 300 ft.
Return to parent product
  • The Preparation, Storage, and Placing of Hydraulic Fill, C.S.A. Mine, Cobar
    PDF
    This product is exclusive to Digital library subscription
  • The Preparation, Storage, and Placing of Hydraulic Fill, C.S.A. Mine, Cobar
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1968
  • PDF Size: 0.367 Mb.
  • Unique ID: P_PROC1969_1217

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.