Conference Proceedings
Underground Operators' Conference, Broken Hill
Conference Proceedings
Underground Operators' Conference, Broken Hill
1.3 Million Tonnes Blast In T33-34 Stope At Mount Isa Mines Limited
The T33-34 blast, the first major blast at Mount Isa Mines, broke 1,360,000 tonnes of copper ore using 349 tonnes of explosives. The original concept of firing T33, T34, T35 and U37 separately was changed during the life of the project due to adverse ground conditions._x000D_
These conditions also caused the stoping method to be modified after the firing of the stopes had started. To stabilise the two stopes T33 and T34 where large fall off was occurring, rib pillars were left in the original slot. This caused the blast design to be more complex as these rib pillars had to "lead" the blast. The implication of such a large blast on the underground and surface environment was thoroughly investigated and precautions taken._x000D_
The charging time of the blast was six weeks._x000D_
Hook-up was started four days before the blast and continued until two hours prior to the blast. Detailed scheduling was carried out of other work that had to be done in the 24 hours before the blast to ensure that there were no delays in the firing.
These conditions also caused the stoping method to be modified after the firing of the stopes had started. To stabilise the two stopes T33 and T34 where large fall off was occurring, rib pillars were left in the original slot. This caused the blast design to be more complex as these rib pillars had to "lead" the blast. The implication of such a large blast on the underground and surface environment was thoroughly investigated and precautions taken._x000D_
The charging time of the blast was six weeks._x000D_
Hook-up was started four days before the blast and continued until two hours prior to the blast. Detailed scheduling was carried out of other work that had to be done in the 24 hours before the blast to ensure that there were no delays in the firing.
Contributor(s):
R H Stephens
-
1.3 Million Tonnes Blast In T33-34 Stope At Mount Isa Mines LimitedPDFThis product is exclusive to Digital library subscription
-
1.3 Million Tonnes Blast In T33-34 Stope At Mount Isa Mines LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1977
- PDF Size: 0.12 Mb.
- Unique ID: P197703001