Lower Levels Project Development at the C.S.A. Mine, Cobar
The lower levels at the CSA Mine have been developed to mine reserves between the No.7 level and No.9 level._x000D_
Work on major excavations for the project began during 1982 with the develop- ment of the crusher chamber, on No.9 level._x000D_
The brows and walls were pre-dowelled to improve stability before mining by mass blasting techniques._x000D_
At the same time work commenced on the extension of No.2 Shaft from No.7 level to No.11 level. The shaft was stripped, using hand held drilling, to a raise bored hole and concrete lined to a diameter of 5.5 metres._x000D_
Plats were developed at No.8 level, No.9 level and the loading station.
Work on major excavations for the project began during 1982 with the develop- ment of the crusher chamber, on No.9 level._x000D_
The brows and walls were pre-dowelled to improve stability before mining by mass blasting techniques._x000D_
At the same time work commenced on the extension of No.2 Shaft from No.7 level to No.11 level. The shaft was stripped, using hand held drilling, to a raise bored hole and concrete lined to a diameter of 5.5 metres._x000D_
Plats were developed at No.8 level, No.9 level and the loading station.
Contributor(s):
A G L Pratt, B P M Grant
-
Lower Levels Project Development at the C.S.A. Mine, CobarPDFThis product is exclusive to Digital library subscription
-
Lower Levels Project Development at the C.S.A. Mine, CobarPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1985
- PDF Size: 0.619 Mb.
- Unique ID: P198502017